Grid-Scale BESS Deployment
Energy

Grid-Scale BESS Deployment

Challenge

Deploy a 50MW/100MWh battery energy storage system with aggressive timeline and complex grid integration requirements.

Approach

Integrated EPCM approach with parallel workstreams, pre-fabricated modules, and continuous commissioning strategy.

Outcome

Delivered 2 months ahead of schedule with 99.7% availability in first year of operation.

50MW/100MWh
Capacity
2 months early
Timeline
99.7%
Availability
Defense Platform Prototype
Defense

Defense Platform Prototype

Challenge

Develop a ruggedized mobile power system meeting MIL-STD requirements within 18-month development cycle.

Approach

Concurrent engineering with rapid prototyping, environmental testing, and iterative design validation.

Outcome

Successfully completed qualification testing on first submission, reducing typical timeline by 40%.

18 months
Dev Cycle
First submission
Test Pass
40%
Timeline Saved
Industrial Plant Retrofit
Industrial

Industrial Plant Retrofit

Challenge

Modernize legacy control systems while maintaining continuous plant operation and zero safety incidents.

Approach

Phased implementation with hot-cutover strategy, extensive simulation, and risk-based planning.

Outcome

Zero downtime migration achieved with 35% improvement in operational efficiency.

Zero
Downtime
35%
Efficiency Gain
Zero
Safety Incidents