50 MW/100 MWh BESS Delivery Program
End-to-end PMC/EPCM delivery for grid-scale energy storage project. Management of all processes from design to commissioning.
TEMROB delivers end-to-end PMC/EPCM for BESS and energy storage programs—from design through commissioning—within an institutional framework of systems engineering discipline, risk-based governance, and investor-grade reporting.
Integrated governance architecture covering all phases of BESS delivery.
Requirements and interface management, grid compliance controls, and traceable decision architecture.
Integrated project management, procurement governance, and site quality assurance architecture.
FAT/SAT protocols, performance tests, and O&M readiness for secure transition.
Governance architecture covering all control points from scope to reporting.
Deliverable evidence produced at each gate, tied to acceptance criteria, traceable.
Controlled delivery with defined inputs, outputs, and gate criteria at each step.
Project definition, stakeholder expectations, existing documentation
Scope document, interface list, assumption set
Scope document, technical spec, site data
Risk register, gap analysis, mitigation plan
Approved scope, grid requirements, OEM selection
FEED package, IMS baseline, cost baseline
Approved design, procurement contracts, ITP
Installation, FAT/SAT, commissioning readiness
Commissioning report, punch list, O&M package
Handover file, warranty framework, operational transition
Projects completed with gate-based governance and traceable delivery.
In-depth content on BESS delivery, governance, and engineering topics.
TEMROB drives your BESS investments to success with institutional-grade governance architecture and traceable delivery framework.